The installation of the EasyClean™ water management system has helped a French milk production company to improve its hygiene standards and to reduce water usage at its plant in the west of the country.

Chemical plant saved over €500,000 in the first year
A critical glue agitator vessel was affecting productivity for a silicone manufacturing facility in France. The installed mechanical seal was had a life of between 4 and 8 weeks, and replacement required the agitator to be off-line for 7 days. This situation was costing the company thousands of Euros in lost production.

AESSEAL improves reliability at French chemical plant
A chemical production company in France was experiencing premature failure of a competitor’s seal on a high temperature terpene process transfer pump.

DMSC is worth its salt
A poorly-designed seal was causing problems for a major salt producer in eastern France.

ROI In Less Than A Month
With one of the biggest corrugated cardboard manufacturing factories in Europe, a French cardboard manufacturer was experiencing seal failures every two months. AESSEAL® worked closely with the customer to find the right solution.

Improved reliability and reduced water usage
A pulp and paper manufacturer in France was using gland packing to seal the side entry agitator on a stock pulp mixer. The gland packing had a mean time between failure (MTBF) of just 2 months and was using 2.4 million litres of water per year. The company turned to AESSEAL® for assistance.

AESSEAL product aids major cuts to water usage
The French company Norpaper Nantes was having issues with the seal of its mixer’s drain pump, which was not working properly and typically needed replacement after only three months, resulting in significant labour costs and lost production. The cause of the problem was the presence of particles in the plant water supply, and a lack of consistency in water pressure.

CDM reliability: the answer to seal failures
A corrugated packaging plant in northern France was experiencing persistent seal failures, on average every two months.

CDM the key to greater reliability
A French pulp and paper manufacturer was using gland packing on its pulp tank agitators. This required regular replacement of the packing and frequent adjustments to the packing compression.

AESSEAL solves reliability problems for paper company
Persistent leaks from gland packing were causing constant interruptions to the production process at a paper company in south-eastern France. The failure of the packing every few weeks was resulting in damage to the shaft of the pump and causing product to leak into the work area.